Project |
Arable Farm Renewable Colocation |
Location |
East Anglia, UK |
Industry |
Agriculture |
Application |
Colocation |
Brief |
A Flex-ESS250 was deployed to assist a large arable farmer with maximising the farm’s self-consumption of multiple renewable assets. Working on a zero feed-in the battery has allowed the farm to utilize all the renewable generation on site. In a drive to reduce carbon emissions as much as possible. |
Specification |
|
Renewable Colocation on Large Arable Farm
Previous
Previous
Hydrogen on the Starting Grid
Next
Next