Rumble in the Jungle
| Project | Power Improvement for Large Brewery | 
| Location | Kinshasa, Democratic Republic of Congo, Africa | 
| Industry | Food manufacturing | 
| Application | Commercial and industrial | 
| Brief | MSP were commissioned to build 2 power conversion systems to improve the power quality of a major brewery located in Kinshasa DRC. Utilising the Flex-ESS500 5millisecond response time the system was designed to pick up and respond to fluctuations in the grid that would be missed by conventional equipment. | 
| Specification | 
 | 
SRT - Sag Reduction Technology
 
                         
            